1 Kalzip FC façade system Installation manual 1

2 2

3 Contents Overview Page 1.0 Introduction System overview Transport, storage and handling General information Sub-construction alignment Panel support requirements Wall construction Modular click rail SEL on L-brackets FC Facade Horizontally spanning FC vertically spanning Modular click rail SE on cladding rails FC horizontally spanning FC vertically spanning Modular click rail SE on U-bracket FC horizontally spanning Modular click rail SE on structural cassette FC horizontally spanning Modular click rail SE on sandwich carrier FC horizontally spanning FC vertically spanning Modular click rail setting out tool Click rail adapter SE & SEL Horizontal panel installation Panel installation (bottom to top) Panel installation (top to bottom) Vertical panel joints Fixed points Adjustment of panel position Corner panels Flashing installation Panel replacement and tools Tips and Tricks 75 3

4 1.0 Introduction This installation manual specifies the correct methods for installing the Kalzip FC façade system, including support elements, panels and accessories. It should be read together with the technical approval document Zulassung Z (August 2015). It should also be used in conjunction with all other applicable technical approvals, standards and safe working procedures on the construction site. Installation of the Kalzip FC façade is carried out using proprietary system support rails fixed to an adjustable subconstruction suitable for rainscreens.the chosen subconstruction should be adjustable to accommodate building tolerances to achieve a plane surface in accordance to ensure the FC Facade system can be installed within the recommended tolerances and specifications as stated in this manual. The manual contains general information about the FC façade system and its components together with detailed drawings and explanatory text for installation. The renderings and drawings are not to scale and therefore should not be dimensioned. Where appropriate, drawings are labelled with metric dimensions. Care has been taken to ensure that the information contained within this manual is correct. At the time of publication, the diagrams and descriptions represent our current knowledge of best practice. They are intended as guidelines for standard applications and do not necessarily apply in all situations. Other relevant standards and local building regulations must also be taken into account. 4

5 Introduction Suggestions for, or descriptions of, the end use or application of products or methods of working are for information only and Kalzip accepts no liability in respect thereof. Before using information or products supplied or manufactured by Kalzip the end-user should satisfy himself that they are suitable for their intended purpose. Due to the dynamic nature of product development and continuous technical improvement, Kalzip reserves the right to make amendments to the installation manual and technical specifications given at any time without prior notice. End-user should therefore check that they have the latest available edition of this manual. Visit 5

6 2.0 System overview The FC façade from Kalzip is a quick to install, open-jointed, lightweight, flat metal rainscreen system. It provides a cost-effective solution for horizontally and vertically spanning cladding applications for both new build and refurbishment projects. Profile dimensions The FC panels are available from 250 mm to 800 mm cover width. The nominal profile depth is 30 mm. Panels can be roll-formed from min. 350 mm to max. 8,0 m standard lengths in the gauges given in Table 1. Fixing-free supports The FC façade system is supplied with proprietary fixing-free panel supports. The FC panels are inserted and clicked into proprietary modular click rails. In summary the system consists of: FC panels with edge returns Modular click rails type SE and SEL with adapters for non-standard cover width transition panels Additional system components, accessories and installation tools such as the fixed point clamp, guidance snapper, flashing support clip and modular click rail setting out tool To ensure trouble-free panel installation, it is essential that the modular click rails are accurately installed according to the guidelines in this manual to give a lined and levelled sub-construction for the FC panels. A range of typical adjustable subconstruction options are illustrated which provide solutions for various types of backing wall

7 System overview Table 1: FC panel thickness and cover width availability Thickness (mm) 30/250 30/300 30/350 30/400 30/450 30/500 30/600 30/700 30/ Available as standard Not available Panel edge returns Kalzip FC façade panels are supplied as standard with 17 mm edge returns. Panels can be supplied without edge returns on request. Some of the diagrams illustrating panel installation in this manual are shown without edge returns for clarity. 17 mm 7

8 System overview Modular click rails There are two types of modular click rail available for mounting FC panels (SE and SEL). Extruded from 2 mm thick aluminium and pre-fitted with plastic inlays, they are supplied in standard lengths of 2985 mm and 5935 mm. Both rails are Structurally Effective (SE) with the same mechanical characteristic values and can be used independently as a spanning element. The spanning capacity must be calculated by the project structural engineer. ject structural engineer. It does not have prepunched holes for fixing as the fixing position is not necessarily at the panel support positions 40 mm Modular click rail SE The modular click rail SE is a Structurally Effective support rail i.e. it can be used independently as a spanning element. The spanning capacity must be calculated by the pro- Modular click rails (SE, SEL), standard lengths Modular click rail SE 55 mm Type Standard length short in mm No of click points Standard length long in mm No. of click points Note The position of the first inlay on each modular rail is located 95 mm from the bottom of the rail 95 mm 8

9 System overview Modular click rail SEL This rail has an integrated rear web for ease of installation to standard L-profile helping hand brackets Plastic inlays The plastic inlays are supplied pre-fitted to modular click rails. Due to the panel profile geometry the inserts are provided for left and right sides of the rail or bracket. When installed in a horizontal direction the em - bossed arrow indicates the upward direction. The side of the plastic inlay has a setting out / laser level line to help with alignment of the rails when using a laser level. The setting out / laser level line also corresponds to the centre of the panel gap. Modular click rail SEL 50 mm 35 mm System depth 50 mm System depth modular click rail SEL 70 mm System depth with modular click rail SE Plastic inlays 9

10 System overview Click rail adapter SE and SEL The FC click rail adapter allows non-standard panel cover widths to be accommodated at interfaces such as window heads and cills. See Section 5.7 for detailed installation instructions. Click rail setting out pins The setting out pins are used to accurately space adjacent modular click rails. The adjustable pins are inserted into the modular click rail and can accommodate the full range of standard or non-standard panel cover widths. See Section 5.6. for detailed installation instructions. Fixed-point clamp Every FC panel must have a fixed point clamp installed at a single position along its length. See Section 6.4 and 6.5 for detailed installation instructions 10

11 System overview Guidance snapper The guidance snapper is designed to ensure a constant joint line between adjacent panels. See section 6.5 for information on use of the guidance snapper with straight panels. The guidance snapper is also used at internal and external corner panels to ensure correct panel alignment. See Section.6.6 for detailed installation instructions on corner panels. Flashing support clip The flashing support clips into the modular click rails without the need for additional mechanical fasteners. It ensures that a consistent, level surface is provided to which flashings can either be screwed or riveted. See Section 7 for detailed installation instructions. Panel removal tools The two panel removal tools allow easy removal of individual FC panels without the need to demount a complete bay. The panel can either be replaced with a new one or the original panel refitted. This is a key benefit when access is required to the rainscreen cavity for maintenance, cleaning or fixing scaffolding to the backing wall. See Section 8.0 for further instructions on individual panel removal. 11

12 3.0 Transport, storage and handling Transportation of panels to site As standard, FC panels are transported by road up to a maximum length of 8 m. The panels are packed in pairs up to a maximum of 25 pairs per row. The table below gives maximum pack sizes for different FC panel cover widths. Cover width (mm) No. rows Max. no sheets System components and accessories are packed as follows: Modular click rails Modular click rails are supplied in standard lengths of approximately 3 m or 6 m on wooden pallets. The maximum pallet size is 1.2 m width x 1.2 m height. Fixed point clamp The fixed point clamp is supplied as standard in boxes of 50 pieces with a 3 mm Allen tool included for locking and un-locking the clamp. Guidance snapper The guidance snapper is supplied as standard in boxes of 50. Unloading of panels on site The maximum pack weight for 8 m length sheets is 2.0 t. Make prior arrangements for lifting gear such as cranes, fork lift trucks, spreader beams, sling belts, etc. Protect the edges of pallets if sling belts are used. Access to the delivery address point must be guaranteed, this applies for all deliveries. Before delivery, the person who has placed the order must check the site and it may also be necessary for the transport agent to check the route. Delivery dates must be agreed with the supplier. Adapter SE and SEL Both modular click rail adapters are delivered as standard in boxes of

13 Transport, storage and handling Panel storage Panels should be stored under cover to prevent accumulation of dirt and condensation. Store at an angle on cross bearers and cover to allow air circulation. Unpacking panels Caution Exercise care when opening packages stored at an angle. There is a risk of panels sliding sideways and/or in the direction of slope. When removing packaging from the panels with a blade, take care not to scratch the painted surface of the panels. To reduce the risk of damaging FC panels, ropes should not be used. Slings with a minimum 150 mm width are recommended. 13

14 Transport, storage and handling Panel protective film FC panels are supplied with a protective polyethylene film. The film can be temporarily kept on the panels during installation to protect them from contamination from other works, provided that before installation, the film is peeled back from the edge fold area. This is to ensure that the rest of the film can be removed from the remainder of the panel. In any case the film should be removed from panels in opened packages within fourteen days. Checking incoming materials Obtain confirmation of any material and packaging deficiencies from the forwarder and notify the supplier immediately. Check that the number of packages and their contents agree with the delivery documents. Inform the supplier immediately of any discrepancies in dimensions or quantities etc. Any damage occurring during transport must be reported before installation. Claims for damaged goods will not be accepted after installation. All claims must be made within one week of arrival on the building site. Panel handling Suitable protective gloves should always be worn when handling FC panels. When carrying individual panels on-site, make sure to keep them in an upright position. 14

15 4.0 General information Before commencing with installation of the FC façade system, this chapter should be read in its entirety. It contains two sections giving key information on sub-construction tolerances and panel support requirements which apply to all sub-construction variations and panel cover widths. 4.1 Sub-construction alignment Installation of the Kalzip FC façade is achieved in combination with a suitable sub-construction system (see section 5.0). The sub-construction system must be capable of accommodating building tolerances to ensure that the supporting elements are lined and levelled to suit the tolerances given in this section. These requirements are divided into a number of specific criteria, all of which must be met. Face alignment Three conditions for the face alignment of modular click rails must be satisfied. 1. Over the complete length of an FC panel, no modular click rail must be positioned more than 1.5 mm from the datum line. 2. Horizontally adjacent modular click rails must be aligned within 1.0 mm of each other (independent of the distance between them). Distance between first and last rails supporting a panel Adjacent modular click rails max mm max mm Datum line max. 1.0 mm 15

16 Sub-construction alignment 3. Vertically adjacent modular click rails must be aligned within 1.0 mm of each other. Panel cover width The distance between panel locking points in vertically adjacent modular click rails must be within + / mm of the nominal panel cover width. See section 5.6 for information on using the modular click rail setting out tool. max. 1.0 mm Cover width + / mm 16

17 Sub-construction alignment Height alignment Note Do not use the top or bottom of the modular click rails as a reference point to make measurements always use the setting out / laser level lin on the plastic inserts to check the height alignment. Over a complete FC panel length, the maximum deviation from the datum line must not exceed 1.5 mm. Between adjacent modular click rails, the difference in height position must not exceed 1 mm (independent of rail spacing). Distance between first and last rails supporting a single panel length Adjacent modular click rails max mm max mm max. 1.0 mm Datum line 17

18 Sub-construction alignment Vertical alignment Over a 3 m length, the alignment of modular click rails must be within + / - 5 mm of the vertical. max mm Vertical max mm 3 m 18

19 Sub-construction alignment Rotational alignment The modular click rails must be aligned to within the tolerance shown below. Fixed point in centre of upper modular click rail 1.5 m Gliding point max. 1.0 mm Modular click rail expansion joint To allow for thermal movement, the modular click rails should be ideally a maximum of 3 m in length, preferably with the fixed point at the top of each modular click rail. It is also possible to position the fixed point in the centre of the modular click rail as shown in the example below. 1.5 m Gliding point Fixed point in centre of lower modular click rail To make the sliding point effective, a spacer pad must be used with the rivet gun to ensure the rail is free to expand and contract. An alternative way of ensuring movement is to use bulbtite rivets with a grip range greater than the thickness of the two clamped materials for the sliding point and use a suitable screw fastener for the fixed point. 19

20 4.2 Panel support requirements for horizontally spanning applications This section gives an overview of general panel support requirements for horizontal applications. Section 6.3 gives further information on vertical panel joints. Panel overhangs To ensure sufficient room for the installation of flashings (either directly on the sub-construction or using the proprietary flashing support) the minimum distance between the centre of the panel support point and the edge of the panel is 80 mm. The maximum allowable panel overhang is 20 % of the panel span unless detailed calculation is used to determine otherwise. Minimum joint width All vertical panel joints must be a minimum of 10 mm width. This is to ensure there is sufficient space for the panels to expand and contract. For panels longer than 10 m, 1 mm per linear metre gap should be allowed. Flashing holder To allow for installation of panels, the maximum overall depth of joint closer flashings is 13 mm. (See image below) max.13 mm min. 80 mm min. 10 mm 20

21 Panel support requirements for horizontally spanning applications Stop A single modular click rail must never be used to support two FC panels. Maximum panel span The maximum panel span (distance between adjacent panel supports) is limited to 1.60 m independent of structural performance. max. span 1.6 m max. overhang 20 % of span * * unless detailed calculation is used to determine otherwise. 21

22 Panel support requirements for horizontally spanning applications Straight panels Every standard FC panel requires a single fixed point clamp. For single-span panels, a guidance snapper is required at the opposite end of the panel. Multi-span panels For multiple-span panels a guidance snapper is not required unless the application is for ceilings or soffits. The fixed point allows for the control of thermal movement of the panel. The guidance snapper provides a positive panel engagement and thereby ensures a consistant horizontal panel-to-panel joint line. Fixed point clamp Guidance snapper Single span FC panel 22

23 Panel support requirements for horizontally spanning applications Corner panels For corner panels with unequal length sides, the fixed point should be installed on the long side of the panel. Guidance snappers must be installed at both ends of all corner panels, whether they have unequal sides or not. See Section 6.6 for further information on corner panel installation. min. 80 mm, max. 20 % of panel span. Guidance snapper Fixed point clamp min. 300 mm, max mm min. 10 mm min. 80 mm, max. 100 mm min. 150 mm, max mm 23

24 5.0 Wall constructions The Kalzip FC façade system must be installed on a line and levelled sub-construction for the installation of the FC Facade panels. This is required to ensure a lined and levelled surface for supporting elements. It also provides a cavity for wall insulation and an air gap for drainage and ventilation. This chapter gives an overview of different panel installations on a range of backing wall. The type numbering follows the same sequence as the 2D and 3D construction details. 5.1 Modular click rail SEL on L-brackets FC horizontally spanning FC vertically spanning 5.2 Modular click rail SE on cladding rails FC horizontally spanning FC vertically spanning 24

25 Wall constructions 5.3 Modular click rail SE on U-brackets 5.4 Modular click rail SE / SEL on structural cassette FC horizontally spanning FC horizontally spanning 5.5 Modular click rail SE on sandwich carrier (Hybrid) FC horizontally spanning FC vertically spanning 25

26 5.1 Modular click rail SEL on L-brackets FC facade horizontally spanning The modular click rail SEL is a structurallyeffective vertical support rail compatible which can be fixed directly to standard helping hand brackets. Alignment of this type of sub-construction variation, using only two components is carried out it a single step. Installation procedure Install the SEL modular click rail onto standard helping hand brackets. Using this system, the complete alignment of the sub-construction must be carried out accurately in a single step. Adjust the rails to suit the installation tolerances for the FC facade system as noted in Section 4.1. Check the distances A, B and C are correct according to the project drawings. 26

27 Modular click rail SEL on L-brackets Fixed point The number of rivets or screws required to make a fixed point must be installed according to the project structural design calculations and drawings. Sliding point Rivets or screws (according to structural requirements) fixed in slotted holes. Note The arrangement of fixed points and sliding points must ensure adequate accommodation of thermal movement. 27

28 Modular click rail SEL on L-brackets FC facade vertically spanning The modular click rail SEL is a structurally effective vertical support rail which can be fixed directly to standard helping hand bracket. Alignment of this sub-construction variation, using only two components is carried out it a single step. Installation procedure Install the SEL modular click rail onto standard helping hand brackets. Using this system, the complete alignment of the sub-construction must be carried out accurately in a single step. Adjust the rails to suit the installation tolerances for the FC facade system as noted in Section

29 Modular click rail SEL on L-brackets Note The arrangement of fixed points and sliding points must ensure adequate accommodation of thermal movement. 29

30 5.2 Modular click rail SE on cladding rails FC horizontally spanning Using horizontal rails fixed to adjustable wall brackets simplifies the installation procedure by splitting the alignment of the modular click rails into two steps alignment in the plane of the backing wall followed by height and vertical alignment. Installation procedure Install the horizontal rails onto standard adjustable helping hand brackets. Adjust the inplane alignment of the horizontal rails to the tolerances specified in Section 4.1. Check the distances of the helping hand brackets and the rails as well as the number of fixings to be used according to the project structural design calculations and drawings. Suitable accommodation of horizontal thermal movement of support rails should be ensured. 30

31 Modular click rail SE on cladding rails The modular click rail SE should be fixed to the horizontal cladding rails with the appropriate number of self drilling/tapping screws or rivets, taking account of thermal movement. Always use the laser marking on the side of the plastic insert as the height reference. Adjust the vertical alignment of the modular click rail SE to the tolerances specified in section

32 Modular click rail SE on cladding rails FC facade horizontally spanning Using horizontal rails fixed to adjustable helping hand brackets simplifies the installation procedure by splitting the alignment of the modular click rails into two steps alignment in the plane of the backing wall followed by height and vertical alignment. Installation procedure Install the vertical cladding rails onto standard adjustable helping hand brackets. Adjust the inplane alignment of the vertical cladding rails to the tolerances specified in Section 4.1. Check the distances A, B and C are correct according to the project drawings. Accommodation of horizontal thermal movement of support rails should be carried out according to one of the methods described in Section

33 Modular click rail SE on cladding rails The modular click rail SE can be fixed to the horizontal rails with self drilling/tapping screws or with rivets. Always use the setting out / laser line on the side of the plastic insert as the height reference. Adjust the vertical alignment of the modular click rail SE to the tolerances specified in section 4.1. Note The arrangement of fixed points and sliding points must ensure adequate accommodation of thermal movement. 33

34 5.3 Modular click rail SE on U-bracket FC facade vertically spanning Using horizontal rails fixed to adjustable helping hand brackets simplifies the installation procedure by splitting the alignment of the modular click rails into two steps alignment in the plane of the backing wall followed by height and vertical alignment. Installation procedure Install the modular click rail SE onto U-profile helping hand brackets. Using this system, the complete alignment of the sub-construction must be carried out accurately in a single step. Adjust the rails to suit the installations tolerances for the FC facade system as noted in Section 4.1 Check the distances A, B and C are correct according to the project drawings. 34

35 Modular click rail SE on U-Brackets Fixed point Rivets or screws fixed in circular holes (on both sides of the U- bracket). Sliding point Rivets or screws fixed in slotted holes (on both sides of the U- brackets). Note The arrangement of fixed points and sliding points must ensure adequate accommodation of thermal movement. 35

36 5.4 Modular click rail SEL on structural cassette FC horizontally spanning For installation on steel structural liner trays, the modular click rail is fixed to the top flanges of the tray by means of a thermally broken fixing system. Installation procedure Using this variation discrepancies in alignment must be accommodated by an additional sub-construction. Using structural cassettes as the backing wall, the maximum spacing between modular click rails must be verified by the project structural engineer. The dead weight of the sub-construction, modular click rails and FC panels must be either transferred back to the building structure at the head or the base of the façade according to project-specific calculations. Check the rails are aligned to the tolerances specified in section X.X. The modular click rail SEL can be fixed to the L-profile which is fixed on to structural cassette with self drilling/tapping screws or with rivets. 36

37 Modular click rail SE on structural cassette Note The he number of fixings must be according to the project structural design calculations. 37

38 5.5 Modular click rail SE on sandwich carrier panel FC horizontally spanning For installation on horizontally spanning sandwich panels, the modular click rail SE is fixed to the external steel face of the sandwich panel with approved self-drilling fasteners. Installation procedure Using this variation the alignment of the sandwich panels must be checked and confirmed to be within sufficient tolerance to meet the requirements outlined in section 4.1. Using the approved SFS SLG-6,5 or EJOT JF3 self-drilling screws the modular click-rail is fixed into the outer steel face. To accommodate thermal movement, the modular click rail SE is supplied pre-punched with alternative round and slotted holes. One fixed point is required per rail. The optimal configuration is to make the fixed point in the same position in each rail. 38

39 Modular click rail SE on sandwich carrier panel Note The number of fixings must be installed according to the project structural design calculations. 39

40 Modular click rail SE on sandwich carrier panel FC vertically spanning For installation on horizontally spanning sandwich panels, the modular click rail SE is fixed to the external steel face of the sandwich panel with approved self-drilling fasteners. Installation procedure Using this variation the alignment of the sandwich panels must be checked and confirmed to be within sufficient tolerance to meet the requirements outlined in section 4.1. Using the approved SFS SLG-6,5 or EJOT JF3 self-drilling screws the modular click-rail is fixed into the outer steel face. To accommodate thermal movement, the modular click rail SE is supplied pre-punched with alternative round and slotted holes. One fixed point is required per rail. The optimal configuration is to make the fixed point in the same position in each rail. 40

41 Modular click rail SE on sandwich carrier panel Note The number of fixings must be installed according to the project structural design calculations. 41

42 5.6 Modular click rail setting out tool To allow for thermal expansion, all modular click rails are supplied in standard lengths of approx. 3 metre. The setting out tool allows accurate spacing at joins between vertical rails. The tool can be adjusted to accommodate every standard panel cover width. Panel cover width adjustment The setting out tool consists of a rail with two pairs of pins, one pair fixed and one pair adjustable. The tool shown bottom left is set to the 500 mm cover width position. The sequence on page 43 shows how to reset the cover width to 300 mm. Setting out modular click rails The modular click rails are provided with prepunched holes in their sides to accept the setting out tool locating pins. 1. Align and fix the lower set of modular click rails according to the tolerances given in section 4.1 and the relevant type of subconstruction described in section 5. 42

43 Modular click rail setting out tool To adjust the setting out tool (1) to the required cover width, remove the two clips holding the adjustable pins in place (2), pull the pins out of the rail (3) and relocate in the appropriate holes (4). Replace the clips to secure the pins in their new position (5). The cover width set is shown in the window in the side of the adjustable pins (6). The sequence (1) to (6) below shows each step. image missing 2. Insert the lower set of locating pins of the setting out tool into the top set of holes in the lower modular click rail. 4. Double check that the correct panel cover width is showing in the window in the side of the tool and fix the top modular click rail in position. 3. Insert the bottom of the upper modular click rail into the top set of pins and check the alignment of the rail with a spirit level. 5. Best practice is to start the next rail with the panel support position fixed directly over a wall bracket or horizontal rails. The allowable overhang of any rails must be approved by the project structural engineer. 43

44 5.7 Adapter SE & SEL The click rail adapters SE and SEL are designed to accommodate bespoke cover width panels, which may be required for example at interfaces with windows and doors. The adapter can be installed either on the top or the bottom part of the rail. Due to this, two plastic inlays (left and right) are supplied in the box, which are to be cut and installed onsite. Cut the modular click rail to the required length according to the cover width of the transition panel (see example below). The laser marking should be used as the reference point when measuring to the end of the rail. P = bespoke panel cover width (mm) T = distance from laser marking to top of rail B = distance from laser marking to bottom of rail Adapter SE T = P - 35 Laser marking Laser marking B = P - 50 Adapter SEL Note Minimum bespoke panel cover width, P SE = min. 100 mm SEL = min. 130 mm Example P = 330 mm T = = 295 mm B = = 280 mm 44

45 Adapter SE & SEL Insert the adapter into the modular click rail. For the upper adapter check the distance between the lower edges of adjacent inlays is equal to the transition panel cover width, P. All adapters are supplied with three predrilled holes. These are aligned centrally for the modular click rail SE and staggered diagonally for the SEL rails. The adapter must be secured to the modular click rail with at least two fixings (it is recommended to use rivets). P Ø 5.2 mm hole for Ø 5.0 mm rivet Always use a minimum of two fixings For the lower adapter, check the distance between the upper edges of adjacent inlays. 45

46 46

47 6.0 Horizontal panel installation The following sections illustrate the installation of FC façade panels in horizontally spanning applications. The design of the FC panel profile geometry permits the installation of panels in both directions (from bottom to top or from top to bottom). Top panel edge Panel edge geometry The top and bottom edges of the panel are not symmetrical so care must be taken to ensure the panel is installed the correct way up. Bottom panel edge Correct panel installation Stop Never try to install the panels upside down. Gap width 1.5 mm 47

48 6.1 Panel installation (bottom to top) This sequence shows the installation of FC panels from bottom to top. Refer to section 6.4 for making the fixed point. Note The panel overhang has been reduced in these drawings for clarity only. Refer to the panel support requirements in section

49 Panel installation (bottom to top) 1. Insert the top edge of the first panel over both lower parts of the plastic inlay. Check that the panel can slide freely left to right. 2. Wearing gloves, use the palm of the hand to gently push the bottom edge of panel to click into the upper part of the inlay. 3. The bottom edge of the panel should click into place easily. Check again that the whole panel can slide freely left to right. If the panel cannot slide freely left-to-right, check that the panel can be easily moved up and down before making a fixed-point. Caution Always gently push the panel directly over the clicking point not between the supports. Never force the panel into position this will damage the edges and may require panel replacement. If the panel does not click in easily, double-check the alignment of the sub-construction. 49

50 Panel installation (bottom to top) 4. Install a fixed point clamp and guidance snapper(s) in the lower panel (see section 6.4) before hooking the second panel in place above. 50

51 Panel installation (bottom to top) 5. During bottom-to-top installation, each panel can be sequentially hooked and clicked into the modular click rail. 51

52 6.2 Panel installation (top to bottom) In situations where back-lapping of panels on-site is advantagous, such as during the removal of mast climbers or other aerial platforms, the FC panels can be installed from top-to-bottom. Refer to section 6.4 for making the fixed point. 1. Insert the top edge of the upper panel over the lower parts of the plastic inlays. Check the panel can slide freely left to right. Do not click in the bottom edge of the panel at this stage. 52

53 Panel installation (top to bottom) 2. Insert the lower panel in place as described in step Return to the upper panel and install and tighten the fixed point clamp and insert guidance snapper(s) (see section 6.4). Caution Do not click in the bottom edge of the upper panel until the lower panel has been hung in place and a fixed point has been made in the lower panel. 4. Repeat step 3 for the lower panel before clicking in the bottom edge of the upper panel. 53

54 6.3 Vertical panel joints Vertical panel joints are important for the appearance of the façade. This section should be read together with section 7 on flashing installation which gives a range of possible joint flashings. Minimum joint width All vertical panel joints must be a minimum of 10 mm width. This is to ensure there is sufficient space for the panels to expand and contract. For panels longer than 10 m, 1 mm per linear metre gap is normally adequate. This requirement should be checked according to the local climatic conditions and panel colour/surface finish. Panel overhangs To allow sufficient space for flashings to be fixed (either directly to the sub-construction or via the proprietary flashing supports) there should be a minimum of 80 mm distance between the centre of the clicking points and the edge of the panel. The maximum allowable panel overhang is 20 % of the panel span unless detailed calculation is used to determine otherwise. Panel joints with backing flashing To allow for installation of panels, the maximum overall depth of joint backing flashings is 13 mm. (See image below) max.13 mm min. 80 mm min. 10 mm 54

55 Vertical panel joints Panel joints with protruding flashings For vertical joints which include flashings separating the edges of adjacent panels, the minimum joint width should be 10 mm either side of the flashing. Note For this type of flashing design option, to ensure even vertical panel joint appearance, consideration can be given to installing the fixed point clamp centrally along the panel length. min. 80 mm min. 10 mm min. 10 mm 55

56 6.4 Fixed points Every FC panel must have one fixed point to stop the panel sliding out of place during thermal movement. This is achieved using the proprietary fixed point clamp supplied with the system. Fixed point location The fixed point clamp should normally be installed in the same position of straight panels to divide the thermal movement equally left and right. max. span 1.6 m min. 80 mm Check panel can slide freely before installing the fixed point clamp Check that the panel can also be moved easily up and down before securing the fixed point. 56

57 Fixed points Installation sequence Before making the fixed point, check that the panel slides freely left-to-right and up and down in the plastic inlays. Make sure the panel is in the correct horizontal position in relation to flashings or adjacent panels. After the lower panel is installed, the fixed point clamp is inserted between the plastic inlays and clips over the two internal pins in the top of the inlays. When the clamp is in position, screw until hand-tight using a Ø 3 mm Allen head screwdriver The fixed point clamp in any panel should be tightened before the bottom edge of the panel above can be clicked in. Caution Take care not to overtighten the grub screw into the clamp. 57

58 6.5 Adjustment of panel position After the FC panels have been installed and fixed points have been made, it is possible to re-adjust the position of the panels as shown below. 1. Horizontal misalignment of lower panel. 2. Wedge upper panel either side of fixed point with 4 mm shims. 58

59 Adjustment of panel position 3. Unlock fixed point clamp with Ø 3 mm Allen head screwdriver. 4. Align lower panel to correct position 59

60 Adjustment of panel position 5. Relock fixed point clamp hand-tight 6. Remove wedges to return upper panel to original vertical position 60

61 6.6 Corner panels When no flashing is wanted at the corners, symmetric and non-symmetric internal and external corner FC panels can be supplied to order. This section gives details on the correct installation methods. Panel supports Special attention must be paid to the installation of corner panels. A panel support point must be positioned a minimum of 80 mm and a maximum of 20 % of the length of that side of panel taken from the corner (A). For corner panels with unequal length sides, the corner support point should be positioned on the long side of the panel. At both ends of the panel, a support point must also be positioned a minimum of 80 mm and maximum of 20 % of the length of that side of the panel from the panel edges (B). This requirement applies whether the sides of the panel are unequal or not. See drawing on page

62 Corner panels Corner panel fixed point A fixed point clamp must be installed at the support point located at the corner of the panel. 62

63 Corner panels Corner panel guidance snapper Guidance snappers should be installed at the support points at both ends of the panel. This is to ensure that the panels are properly engaged on both sides. The guidance snapper is simply clipped over the pins at the top of the plastic inlay. 63

64 Corner panels Corner panels (plan view) Guidance snapper Guidance snapper Fixed point clamp min. 80 mm, max. 20% of panel span min. 80 mm, min. 300 mm, max mm max. 20% of panel span. min. 10 mm min. 80 mm, max. 100 mm min. 150 mm, max mm Note For information on double-corner panels please refer to the separate information sheet. 64

65 7.0 Flashing installation Fixing flashings between panels is made fast and easy using the proprietary flashing support accessory. This component clicks into pre-punched holes in the modular click rails without the need for any additional fixings and provides a flat self-aligned surface to which flashings can be screwed or riveted

66 Flashing installation Note The flashing support should never be used to fix modular click rails to the sub-construction. 66

67 8.0 Panel replacement and tools In the event of wall damage, the FC façade click system allows individual panels to be replaced without the need to demount the complete façade. Individual panels can be removed quickly and easily using the specially developed panel removal tools avail-able in the Kalzip FC Toolkit. Caution For the handling and removal of panels it is always necessary to wear adequate protective clothing, in particular safety shoes and protective gloves. 67

68 Panel replacement and tools 1. To remove an individual panel from the façade, the panel above it must first be unclicked at it lower edge. When using the panel removing tool with round grip, the panle may need to be slid to the one side to create sufficient space to insert the tool into the vertical joint. Insert wedges and unlock the fixed point clamp. Slide the panel to the side and relock the fixed point clamp. Remove the wedges. Note Unclicking the panel is easier when the fixed point clamp is locked When using the flat panel removal tool, widening of the vertical joint is not normally required provided it is a minimum of 10 mm. 68

69 Panel replacement and tools 2. If using the round grip removal tool, insert it into the widened vertical joint at the bottom edge of the panel above that to be removed and rotate it into the horizontal joint (detail A). Slide along to the first unclicking position. If using the flat grip removal tool the same operation can be achieved without the need to move the panel to the side (detail B). Detail A Detail B Note To insert the flat grip panel removal tool without moving the panel to the side, the vertical joint width must be a minumum of 10 mm. 69

70 Panel replacement and tools 3. Use the panel removal tool (round or flat grip) to release the lower panel edge out of the hooks. 70

71 Panel replacement and tools 4. Slide the panel removal tool along to the next unclicking position and repeat step 3 until the bottom edge of the panel is completely free from the supports. 71

72 Panel replacement and tools 5. Repeat 1 to 4 for the panel to be removed. 6. Release fixed point and remove the guidance snapper(s) from the panel to be removed. 72

73 Panel replacement and tools 7. Remove the panel. For safety under wind loading, the upper panel should always be clicked in and have its fixed point clamp locked. 8. Insert replacement panel and follow the bottom-to-top installation sequence shown in section 6.1 (page 48). Note With care, the same panel can be removed and reinstalled later if access is required to the rainscreen cavity for maintenance. 73

74 9.0 Tips and tricks Portable edge folding device The edge folding device enables the installer subsequent shortening / adjustment of FC facade panels on the construction site. The shortening of the FC panels is done by means of templates. The edge returns can be adjusted up to a width of max. 500 mm. The edge folding device can be rented from Kalzip GmbH for a small fee and includes its own instruction manual. For more information, please contact your Kalzip dealer or our customer service. 74

75 75

76 Kalzip is a registered trademark. While care has been take to ensure that the information contained in this publication is accurate, neither Kalzip GmbH, nor its agents, accept responsibility or liability for errors or for information which is found to be misleading. Before using products or services supplied or manufactured by Kalzip GmbH, customers should satisfy themselves as to their suitability. Copyright 2019 Kalzip GmbH Kalzip is a Donges Group Company Kalzip GmbH August-Horch-Straße Koblenz GERMANY T +49 (0) E English

39HQ Airovision Air Handling Units

39HQ Airovision Air Handling Units 39HQ Airovision Air Handling Units Mounting instructions CONTENTS 1 - TRANSPORT AND LIFTING INSTRUCTIONS... 3 1.1 - General... 3 1.2 - Transport and storage... 3 1.3 - Roof edge protection during transport

More information

Window Installation Instructions

Window Installation Instructions Caution The correct installation methods of windows in full frame or insert applications is critical towards achieving the tested performance of the window and longterm enjoyment and energy savings for

More information

The WANZ Guide to Window Installation

The WANZ Guide to Window Installation The WANZ Guide to Window Installation as described in E2/AS1 Amendment 5 Ver. 1.1 Page 2 of 74 Contents Overview Page 5 Objective Page 5 Scope Page 5 Opening Preparation Page 7 Step P1 Preliminary Check

More information

Removable Aluminium posts

Removable Aluminium posts Post Solent Sail Shades Ltd 120 Billington Gardens Hedge End Southampton SO30 2RT Tel/Fax: 01489 788243 www.solentsailshades.co.uk Email: info@solentsailshades.co.uk Removable Aluminium posts Single Pole

More information

KITCHENS. Tip PAGE 1 FITTING YOUR KITCHEN GUIDE. How to mark out a kitchen. Tools required for installing a kitchen STEP ONE STEP TWO STEP THREE

KITCHENS. Tip PAGE 1 FITTING YOUR KITCHEN GUIDE. How to mark out a kitchen. Tools required for installing a kitchen STEP ONE STEP TWO STEP THREE FITTING YOUR KITCHEN GUIDE How to mark out a kitchen PAGE 1 Before starting on the installation, measure 870mm from the lowest point of the floor and mark a datum line around the room to indicate where

More information

All-Season Sunroom Sliding Glass Door Installation Instructions

All-Season Sunroom Sliding Glass Door Installation Instructions ASRESGD-08 All-Season Sunroom Sliding Glass Door Installation Instructions Panel Frame Door Frame Left Side Foam Insulator IE241 H Bar Assembly Door Frame Top Track Panel Frame Door Frame Right Side Stationary

More information

Installation Manual. Toilet Partitions, Dressing Compartments & Shower Stalls

Installation Manual. Toilet Partitions, Dressing Compartments & Shower Stalls Installation Manual Toilet Partitions, Dressing Compartments & Shower Stalls Metpar Corp 95 State Street, Westbury, New York, USA, 11590 Tel: 516-333-2600 Fax: 516-333-2618 Internet: http://www.metpar.com

More information

Integral Kit Instructions

Integral Kit Instructions Integral Kit Instructions For Fisher & Paykel Cabinet widths of 525, 635, 680, 790 mm wide For curved door Models Series B, C, D & G Manual 814980 Updated August 2008 IMPORTANT If your refrigerator has

More information

Speed-Mat Rectangle Cutter

Speed-Mat Rectangle Cutter Speed-Mat Rectangle Cutter 1 Honeycomb baseboard. 2 Left hold down. 14 3 Bottom hold down. 4 4 Left / right rule. 8 5 8 5 Left / right rule pointer. 1 6 Top / bottom rule. 7 Top / bottom rule pointer.

More information

DE Frame with C Series Sidelight

DE Frame with C Series Sidelight TOOLS REQUIRED Tape measure 6' magnetic level 3' magnetic level Screw gun with clutch adjusted #2 phillips tip #3 phillips tip Screwdriver (used to adjust frame on will using oval slots) Pry Bar Powder

More information

WINDOW INSTALLATION GUIDE FOR NEW CONSTRUCTION - WOOD FRAMING

WINDOW INSTALLATION GUIDE FOR NEW CONSTRUCTION - WOOD FRAMING WINDOW INSTALLATION GUIDE FOR NEW CONSTRUCTION - WOOD FRAMING IMPORTANT NOTICES AND INFORMATION Read these instructions in their entirety prior to installing windows. Any local building code requirements

More information

Premier & Deluxe 3-Season Room Sliding Glass Door

Premier & Deluxe 3-Season Room Sliding Glass Door DTSSGD-11 Premier & Deluxe 3-Season Room Sliding Glass Door Installation Instructions Screen Door Seal Left Side Track Top Track Assembly Right Side Track Right Side Trim Sliding Glass Door Sliding Screen

More information

Cable Support System Guide for Andersen Bow, Bay, and Box Projecting Window Units

Cable Support System Guide for Andersen Bow, Bay, and Box Projecting Window Units for Andersen Bow, Bay, and Box Projecting Window Units Congratulations! You have just purchased one of the many fine Andersen products. Proper assembly, installation and maintenance are essential if the

More information

INSTALLATION INSTRUCTIONS for Bifold Doors (JII103)

INSTALLATION INSTRUCTIONS for Bifold Doors (JII103) Thank you for selecting JELD-WEN products. Attached are JELD-WEN s recommended installation instructions for premium composite, hollow and solid core molded Bifold Doors. Bifolds are designed for fast

More information

The WANZ Guide to Window Installation

The WANZ Guide to Window Installation The WANZ Guide to Window Installation as described in E2/AS1 Amendment 5 2 of 60 Contents Overview 5 Objective 5 Scope 5 Opening Preparation 7 Step P1 Preliminary Check 8 Step P2 Cut the Underlay 9 Step

More information

Basic Spring Motor Roller Shades

Basic Spring Motor Roller Shades Comprehensive Roller Shade Installation Guide Basic Spring Motor Roller Shades ATTENTION!!! READ CAREFULLY! This shade has a reliable long-lasting Spring Motor. The Spring Motor must have proper tension

More information

Replacement Window Installation Guide Non-Impact & Impact Resistant Windows without Nailing Fin

Replacement Window Installation Guide Non-Impact & Impact Resistant Windows without Nailing Fin Replacement Window Installation Guide Non-Impact & Impact Resistant Windows without Nailing Fin americancraftsmanwindows.com Project Requirements: Failure to follow these instructions may void product

More information

IN00419 (rev A) Aqua 6 Glide Quadrant and Off-set Quadrant Enclosure

IN00419 (rev A) Aqua 6 Glide Quadrant and Off-set Quadrant Enclosure IN00419 (rev A) Aqua 6 Glide Quadrant and Off-set Quadrant Enclosure Instruction suitable for both Quadrant & Off-set Quadrant variations. Instruction suitable for both Right and Left Hand fixing variations

More information

Combination Unit 5'6" Windows a i o P t

Combination Unit 5'6 Windows a i o P t for Andersen 5'6" Double-Hung Venting s Windows a i o P t o rs D o Congratulations You have just purchased one of the many fine Andersen products. For ease of assembly and installation and continued enjoyment

More information

INSTRUCTIONS THOROUGHLY BEFORE BEGINNING***************

INSTRUCTIONS THOROUGHLY BEFORE BEGINNING*************** Bill of Materials: RAC0012 Green Wing Aerodynamic Skirt Kit Item Part Number Description Quantity 1 RMC0218 Gen 2 Trailer Skirt Roadside 1 2 RMC0219 Gen 2 Trailer Skirt Curbside 1 3 RMC0041 Trailer Skirt

More information

Active and Passive Sash Replacement

Active and Passive Sash Replacement for Andersen Gliding Windows Read all instructions carefully before attempting this procedure. If you have any questions about your ability to complete the procedure, call Andersen at 1-888-888-7020 for

More information

Chapter 10 - Scaffolding Systems

Chapter 10 - Scaffolding Systems Chapter 10 - Scaffolding Systems Contents Chapter 10 - Scaffolding Systems... 10-1 Check and Oil the Pump Jacks... 10-4 Set Pump Jack Brackets... Error! Bookmark not defined. Set Pump Jack Poles... 10-5

More information

Chelsea Loft Bed WARNING:

Chelsea Loft Bed WARNING: Chelsea Loft Bed WARNING: Failure to follow these warnings and assembly instructions could result in serious injury or death. Read all instructions before assembling bunk bed. KEEP INSTRUCTIONS FOR FUTURE

More information

7. Installation. installation 7.1.1. CAST-IN WINDOW SYSTEM 7.1. INSTALLATION OF WINDOW MAIN FRAME

7. Installation. installation 7.1.1. CAST-IN WINDOW SYSTEM 7.1. INSTALLATION OF WINDOW MAIN FRAME 7. Installation Window involves the fixing of window frame at an earlier construction stage and subsequent of the window sashes. This is a highly workmanship dependent process. Only trained and approved

More information

Installation Instructions

Installation Instructions Installation Instructions READ BEFORE INSTALLING UNIT For Low Profile Window Air Conditioner INSTALLATION WARNINGS AND CAUTION Carefully read the installation manual before beginning. Follow each step

More information

PANELIZED HOME INSTALLATION GUIDELINE

PANELIZED HOME INSTALLATION GUIDELINE PANELIZED HOME INSTALLATION GUIDELINE A typical home package will be constructed of Snap-N-Lock Insulated Panels clad with steel skins. 4" panels will be used for the walls, and 6" panels for the roof.

More information

1 Door Tall Unit ASSEMBLY GUIDE. Page 1 of 9. WARNING: Contains small parts, keep out of reach of children.

1 Door Tall Unit ASSEMBLY GUIDE. Page 1 of 9. WARNING: Contains small parts, keep out of reach of children. Page 1 of 9 ASSEMBLY GUIDE 1 Door Tall Unit IMPORTANT Before Commencing Assembly: Read all instructions COMPLETELY Ensure all listed parts are present If any parts are missing from Parts List 1, please

More information

Dell P Series Monitor VESA Mounting Bracket Installation Instructions

Dell P Series Monitor VESA Mounting Bracket Installation Instructions Dell P Series Monitor VESA Mounting Bracket Installation Instructions The VESA mounting bracket enables a Wyse cloud client to be mounted to the Dell P Series Monitor and the Dell E24 Monitor. The cloud

More information

Original Assembly Guide

Original Assembly Guide TCT Multipurpose Single Bevel Sliding Compound Mitre Saw Original Assembly Guide Read instructions before assembling this tool. Table of Contents GB Assembly Guide Read instructions before assembling this

More information

Lunette 2 Series. Curved Fixed Frame Projection Screen. User s Guide

Lunette 2 Series. Curved Fixed Frame Projection Screen. User s Guide Lunette 2 Series Curved Fixed Frame Projection Screen User s Guide Important Safety and Warning Precautions Please follow these instructions carefully to ensure proper maintenance and safety with your

More information

AMPSEAL* Automotive Plug Connector and Header Assembly

AMPSEAL* Automotive Plug Connector and Header Assembly AMPSEAL* Automotive Plug Connector and Header Assembly Application Specification 24 SEP 97 Rev E All dimensions are given in millimeters unless otherwise specified. All dimensional tolerances are +0.2

More information

Installation Instructions For Slider Casement Air Conditioners

Installation Instructions For Slider Casement Air Conditioners Installation Instructions For Slider Casement Air Conditioners NOTE: These instructions describe installation in a typical wood framed window with a wood SLIDE-BY sash, or installation in a metal CASEMENT

More information

K. D. FRAME ASSEMBLY FOR CLOSED STEEL STUD WALLS...Ins 10. FRAME INSTALLATION DETAILS FOR CLOSED STEEL STUD WALLS...Ins 11

K. D. FRAME ASSEMBLY FOR CLOSED STEEL STUD WALLS...Ins 10. FRAME INSTALLATION DETAILS FOR CLOSED STEEL STUD WALLS...Ins 11 K. D. FRAME ASSEMBLY FOR MASONRY WALLS...........................Ins 2 FRAME INSTALLATION DETAILS FOR MASONRY WALLS......................Ins 3 INSTALLING EXISTING MASONRY WALL ANCHORS IN FRAME..................Ins

More information

WHI 90-Minute Rated Veneered Door Frame Installation Instructions

WHI 90-Minute Rated Veneered Door Frame Installation Instructions No. 940-03-10 INSTALLATION INSTRUCTIONS 90 MINUTE RATED VENEERED DOOR FRAME DOOR REQUIREMENTS: Consult the door manufacturer to make sure that the doors are qualified for the hardware to be installed,

More information

majestic install ation guide barcelona three sided enclosure 24mm surface mounted wall channels and underframe to base

majestic install ation guide barcelona three sided enclosure 24mm surface mounted wall channels and underframe to base majestic install ation guide barcelona three sided enclosure 24mm surface mounted wall channels and underframe to base These Instructions are for a left and right handed unit. The diagrams show a left

More information

DIRECTIONS FOR ASSEMBLING BASE & WALL CABINETS

DIRECTIONS FOR ASSEMBLING BASE & WALL CABINETS DIRECTIONS FOR ASSEMBLING BASE & WALL CABINETS TheRTAStore.com STEP 1: CLEAR A WORK SPACE Place your RTA cabinet panels on a smooth, scratch resistant surface in a large, open area. (Some people like to

More information

HORIZONTAL INSTALLATION

HORIZONTAL INSTALLATION THERMO/SOLAR Žiar s.r.o. MANUAL FOR INSTALLATION PV SUPPORTING FRAMES HORIZONTAL INSTALLATION Technical alternation reserved A1410 1 12/2014 CONTENT ORD.NO. PAGE Mounting information 3 Mounting, flat roof

More information

HP Laser Jet 4200/4240/4250/4300/4350 Swing Plate

HP Laser Jet 4200/4240/4250/4300/4350 Swing Plate HP Laser Jet 4200/4240/4250/4300/4350 Swing Plate 1 Swing Plate Assembly-RM1-0043 1 Swing Plate Kit-5851-2766 (RM1-0043 plus RM1-1091 gear) CAUTION: Fuser may be hot. Turn off printer, unplug it and allow

More information

ASSEMBLY INSTRUCTIONS Residential Roof solutions

ASSEMBLY INSTRUCTIONS Residential Roof solutions ASSEMBLY INSTRUCTIONS Residential Roof solutions CROSSRAIL System USA Table of contents TABLE OF CONTENTS THE COMPANY SAFETY REGULATIONS MATERIALS REQUIRED TOOLS REQUIRED ASSEMBLY TERMS AND CONDITIONS

More information

FTC 2015-2016 DIY Mountain Build Guide

FTC 2015-2016 DIY Mountain Build Guide FTC 2015-2016 DIY Mountain Build Guide Assembly Instructions Check out the DIY2015-2016 Prints and BoM for individual part details. Release 1.0 9/10/15 Page 1 This guide and Bill of Materials are for constructing

More information

INSTALLATION INSTRUCTIONS IMPERVIA (Vent and Fixed) AWNING, CASEMENT, and LARGE AWNING WINDOW WITH FINS

INSTALLATION INSTRUCTIONS IMPERVIA (Vent and Fixed) AWNING, CASEMENT, and LARGE AWNING WINDOW WITH FINS 2009 Pella Corporation INSTALLATION INSTRUCTIONS IMPERVIA (Vent and Fixed) AWNING, CASEMENT, and LARGE AWNING WINDOW WITH FINS Part Number: 80WH0100 Installation Instructions for Typical Wood Frame Construction.

More information

INSTALLATION RECOMMENDATIONS. Outdoor Rubber Tiles

INSTALLATION RECOMMENDATIONS. Outdoor Rubber Tiles INSTALLATION RECOMMENDATIONS Outdoor Rubber Tiles Prior to Installation: The Outdoor Rubber Tiles and accessory transition pieces intended for this installation have been shipped to you via a freight carrier

More information

WINDOW REPAIR MANUAL & REFERENCE GUIDE

WINDOW REPAIR MANUAL & REFERENCE GUIDE WINDOW REPAIR MANUAL & REFERENCE GUIDE TABLE OF CONTENTS DOUBLE HUNG & SINGLE HUNG PARTS 4-5 CASEMENT PARTS 6 SCREEN PARTS 7-8 HOW TO REMOVE TILT-IN SASH 9 HOW TO REMOVE A BALANCE 10 HOW TO INSTALL BALANCE

More information

Installation guide for the SafeLine type anchorage device. Tested in compliance with EN 795: 1996. No.: SE-...

Installation guide for the SafeLine type anchorage device. Tested in compliance with EN 795: 1996. No.: SE-... Installation guide for the SafeLine type anchorage device Tested in compliance with EN 795: 1996 No.: SE-... Version: 09.10.2008 SE 67 Subject to technical alterations! Contents 1. General information

More information

Wren Kitchens Installation Tips... 3. Carefully check your kitchen delivery... 4. Measuring out and marking up... 5. Fitting the base cabinets...

Wren Kitchens Installation Tips... 3. Carefully check your kitchen delivery... 4. Measuring out and marking up... 5. Fitting the base cabinets... tra 1 Index Wren Kitchens Installation Tips... 3 Carefully check your kitchen delivery... 4 Measuring out and marking up... 5 Fitting the base cabinets... 6 Fitting the corner cabinets... 7 The 972mm or

More information

Rack installation instructions

Rack installation instructions Rack installation instructions Review the documentation that comes with the rack cabinet for safety and cabling information. Before you install the server in a rack cabinet, review the following guidelines:

More information

Picnic Table Plans. Made out of a single sheet of plywood, it s also portable! By Kevin Ayer. This children's picnic table would

Picnic Table Plans. Made out of a single sheet of plywood, it s also portable! By Kevin Ayer. This children's picnic table would Picnic Table Plans Made out of a single sheet of plywood, it s also portable! By Kevin Ayer Materials One 4- by 8-foot sheet of 3 4-inch AC plywood Twelve 11 4-inch wood screws Primer and exterior paint

More information

INSTALLATION INSTRUCTIONS for Premium Pocket Windows (JII022) IMPoRtaNt INFoRMatIoN & glossary. safety & HaNdlINg

INSTALLATION INSTRUCTIONS for Premium Pocket Windows (JII022) IMPoRtaNt INFoRMatIoN & glossary. safety & HaNdlINg Thank you for selecting JeLd-weN products. Attached are JeLd-weN s recommended installation instructions for pocket (replacement) double-hung, casement, awning, picture or transom windows, designed to

More information

4RU High Density Shelf Installation Instructions

4RU High Density Shelf Installation Instructions 4RU High Density Shelf Installation Instructions Table of Contents General Product Information... 1.0 Safety Precautions... 2.0 Tools Required... 3.0 Package Contents... 4.0 Installing the Product Unpacking...

More information

FRONT BUMPER INSTALLATION INSTRUCTIONS 2007-2011 DODGE / MERCEDES SPRINTER

FRONT BUMPER INSTALLATION INSTRUCTIONS 2007-2011 DODGE / MERCEDES SPRINTER Aluminess Products Inc 9402 Wheatlands Ct. #A Santee, CA 92071 619-449-9930 FRONT BUMPER INSTALLATION INSTRUCTIONS 2007-2011 DODGE / MERCEDES SPRINTER Please read before beginning Stainless steel hardware

More information

Reachout Lock Replacement for Andersen 2-Panel and 4-Panel 400 Series Frenchwood Gliding, 200 Series Narroline, and Perma-Shield Gliding Patio Doors

Reachout Lock Replacement for Andersen 2-Panel and 4-Panel 400 Series Frenchwood Gliding, 200 Series Narroline, and Perma-Shield Gliding Patio Doors for Andersen 2-Panel and 4-Panel 400 Series Frenchwood Gliding, 200 Series Narroline, and Perma-Shield Gliding Patio Doors Thank you for choosing Andersen. For questions call 1-888-888-7020. For more information

More information

Roll-Up Door Maintenance Guide

Roll-Up Door Maintenance Guide R Roll-Up Door Maintenance Guide Cable Replacement on Two Spring Type Balancer Page 1 Panel Replacement - Removable Roller Cover Type Bottom Panel Page 1 Panel Replacement - Removable Roller Cover Type

More information

Triple Threat 3-in-1 Game Table 3 IN 1 GAME TABLE

Triple Threat 3-in-1 Game Table 3 IN 1 GAME TABLE NG0M Triple Threat 3-in- Game Table 3 IN GAME TABLE Thank 3 in Y Game Table Thank you for your purchase of our product. We work around the clock and around the globe to ensure that our products maintain

More information

INSTALLATION AND OPERATING INSTRUCTIONS For Model GL1 Gate Locks

INSTALLATION AND OPERATING INSTRUCTIONS For Model GL1 Gate Locks Securitron Magnalock Corp. www.securitron.com ASSA ABLOY, the global leader Tel 800.624.5625 techsupport@securitron.com in door opening solutions INSTALLATION AND OPERATING INSTRUCTIONS For Model GL1 Gate

More information

AA Solar and Sun Power Plus

AA Solar and Sun Power Plus AA Solar and Sun Power Plus www.aasolar.co.nz www.sunpowerplus.co.nz -1- Contents Chapter Title Page 1 General information 3 2 Safety and Installer Responsibilities 4 3 Technical Specifications 5 4 Tools

More information

Sash Replacement Guide

Sash Replacement Guide for Andersen 200/400 Series Awning Windows Read all instructions carefully before attempting this procedure. If you have any questions about your ability to complete this procedure, call Andersen at 1-888-888-7020

More information

GENUINE PARTS INSTALLATION INSTRUCTIONS

GENUINE PARTS INSTALLATION INSTRUCTIONS GENUINE PARTS INSTALLATION INSTRUCTIONS DESCRIPTION: Illuminated Kick Plate APPLICATION: Rogue (2011) PART NUMBER: 999G6 GX010 KIT CONTENTS: Item A B C G H QTY 1 1 1 D 1 E 1 F 3 15 6 Description Kick Plate,

More information

Sun Windows General Information Sun New Construction Window Installation Instructions

Sun Windows General Information Sun New Construction Window Installation Instructions Sun Windows General Information Section 1 G F H H H A. Apply Weather Resistive Barrier B. Apply Sill Flashing Tape C. Place Waterproof Sill Shims D. Caulk Back of Nail Fin Sides & Top, Set Window, Fasten

More information

IMPORTANT! READ ALL INSTRUCTIONS BEFORE BEGINNING INSTALLATION. Step 1:

IMPORTANT! READ ALL INSTRUCTIONS BEFORE BEGINNING INSTALLATION. Step 1: IMPORTANT! READ ALL INSTRUCTIONS BEFORE BEGINNING INSTALLATION. Thank you for purchasing your new replacement windows from Great Lakes Window. The following instructions will help remove the old windows

More information

Instructions for Using the Watch Works Tool Kit to Change a Watch Battery

Instructions for Using the Watch Works Tool Kit to Change a Watch Battery Instructions for Using the Watch Works Tool Kit to Change a Watch Battery Click on this link http://www.allamericanwatches.com/site/626101/product/e2306-a to purchase the Watch Battery Replacement Tool

More information

HOW TO INSTALL A BEAUTIFUL NEW KITCHEN

HOW TO INSTALL A BEAUTIFUL NEW KITCHEN HOW TO INSTALL A BEAUTIFUL NEW KITCHEN Easy to follow step-by-step kitchen cabinet installation TOOL AND MATERIAL LIST Hammer Pry bar Screwdriver Phillips Flathead Level Tape measure Pencil Straight edge

More information

BUTTERFLY SHOWER DOOR INSTALLATION INSTRUCTIONS

BUTTERFLY SHOWER DOOR INSTALLATION INSTRUCTIONS BUTTERFLY SHOWER DOOR INSTALLATION INSTRUCTIONS IMPORTANT DreamLine reserves the right to alter, modify or redesign products at any time without prior notice. For the latest up-to-date technical drawings,

More information

Installation Instructions

Installation Instructions Installation Instructions 1. Position the unit onto bridging packers. These keep the unit away from any water sitting inside the frame. 2. Centralise the unit within the frame and pack the edges with appropriate

More information

ARCO Electric Products Installation and Maintenance Manual Low Voltage Automatic Power Factor Correction Capacitor Systems 2013

ARCO Electric Products Installation and Maintenance Manual Low Voltage Automatic Power Factor Correction Capacitor Systems 2013 ARCO Electric Products Installation and Maintenance Manual Low Voltage Automatic Power Factor Correction Capacitor Systems 2013 READ CAREFULLY These instructions are intended to cover good practices in

More information

DIY CABINET REFACING INSTALLATION GUIDE

DIY CABINET REFACING INSTALLATION GUIDE DIY CABINET REFACING INSTALLATION GUIDE CABINET REFACING INSTALLATION Are you ready to reface your outdated cabinets? This guide will show you how to install your new Facelifters Cabinet Refacing Products

More information

Awning Instructions. Standard Manual 1.5m to 4.5m

Awning Instructions. Standard Manual 1.5m to 4.5m Awning Instructions Standard Manual 1.5m to 4.5m English Standard Manual Instructions Contents Warning 1.5m 3.0m Awnings 4 x Expansion bolts (2 per bracket)** 2 x brackets 1 x Awning 1 x Winder handle

More information

Hanson Building Products. precast basement solutions

Hanson Building Products. precast basement solutions Hanson Building Products precast basement solutions Hanson Building Products Basement Systems Add an extra dimension and combine the inherent flexible, structural and waterproof properties of concrete

More information

General Safety. Always do a risk assessment.

General Safety. Always do a risk assessment. recipitous.co.uk Access Equipment Call 020 8684 6999 Scaffold Towers Ladders & Steps Podiums Rigging Tube & Fittings New & Used Sales Hire Repair Manufacture The Skymaster Ladder is a 3 section combination

More information

ISSUE 2. Installation Guide

ISSUE 2. Installation Guide ISSUE 2 Installation Guide Here at Slide and Fold, we LOVE our Bi-Fold Plus range of folding-sliding doors. We want to ensure that your customers love them too. So we have created a new, detailed installation

More information

Sliding and Folding Door Fittings Sliding Door Accessories

Sliding and Folding Door Fittings Sliding Door Accessories Sliding door lock Toplock For 1- and 2-leaf sliding doors Suitable for toughened safty glass and laminated sheet glass Suitable for DIN left and DIN right Max. weight per door leaf 120 kg For glass thickness:

More information

Guidelines for Earthquake Bracing of Residential Water Heaters

Guidelines for Earthquake Bracing of Residential Water Heaters Guidelines for Earthquake Bracing of Residential Water Heaters Department of General Services Division of the State Architect 1102 Q Street, Suite 5100 Sacramento, CA 95814 Phone: (916) 324-7099 Fax: (916)

More information

AZEK Rail Install Guide

AZEK Rail Install Guide TRIM MOULDING DECK PORCH RAIL PAVERS AZEK Rail Install Guide Installing AZEK Rail with Glass Infill... 2 Installing AZEk Rail Stairs with Glass Infill... 9 Notes...14 Please read all instructions completely

More information

CHARISMA SHOWER/TUB DOOR INSTALLATION INSTRUCTIONS

CHARISMA SHOWER/TUB DOOR INSTALLATION INSTRUCTIONS CHARISMA SHOWER/TUB DOOR INSTALLATION INSTRUCTIONS IMPORTANT DreamLine reserves the right to alter, modify or redesign products at any time without prior notice. For the latest up-to-date technical drawings,

More information

Important Information

Important Information Single Door Quadrant Instruction Manual ESQ Important Information Toughened glass is completely safe for use in our shower enclosures and bath screens; providing our products are installed according to

More information

I BEAM TRACK INSTALLATION

I BEAM TRACK INSTALLATION PDQ 0/700 FESTOON SYSTEM INSTALLATION AND MAINTENANCE INSTRUCTIONS INTRODUCTION The PDQ Festoon System was designed to run on one of three sizes of I-beams: S x., S8 x 8. and S x.. System trolleys must

More information

STEEL-RITE II or III COMMERCIAL SECTIONAL DOOR Owner s Manual Supplement Model 52242 NOTICE TO USER

STEEL-RITE II or III COMMERCIAL SECTIONAL DOOR Owner s Manual Supplement Model 52242 NOTICE TO USER STEEL-RITE II or III COMMERCIAL SECTIONAL DOOR Owner s Manual Supplement Model 52242 NOTICE TO USER Thank you for purchasing the Steel-Rite II or III, model 52242 commercial sectional door from RITE-HITE

More information

Combination Unit (shown from interior) WARNING

Combination Unit (shown from interior) WARNING for Andersen Double-Hung Venting s Windows a i o P t o rs D o Congratulations You have just purchased one of the many fine Andersen products. For ease of assembly and installation and continued enjoyment

More information

Technical data sheet PVC Bi-fold doors

Technical data sheet PVC Bi-fold doors Standard Specifications White internally beaded, Deceuninck 3000 series profile 28mm Low-e toughened sealed units with argon gas Open in doors with white handles and hinges Tracks are fitted to the top

More information

149mm. Walk-Thru Assembly Gate. MODEL NO: 1161, 1167 Owner s Manual. www.regalo-baby.com

149mm. Walk-Thru Assembly Gate. MODEL NO: 1161, 1167 Owner s Manual. www.regalo-baby.com 149mm 210mm Walk-Thru Assembly Gate MODEL NO: 1161, 1167 Owner s Manual READ ALL INSTRUCTIONS BEFORE ASSEMBLY AND USE OF GATE. KEEP INSTRUCTIONS FOR FUTURE USE. www.regalo-baby.com... Regalo International,

More information

PITCHED ROOF STRUCTURES

PITCHED ROOF STRUCTURES PITCHED ROOF STRUCTURES for framed and frameless photovoltaic modules Needed tools and materials: cordless screwdriver 10mm and 13mm spanners 5mm Allen key bolts, screws and tools for fixing the system

More information

Sliding Barn Door Hardware Installation Instructions BALDUR and ODEN

Sliding Barn Door Hardware Installation Instructions BALDUR and ODEN Sliding Barn Door Hardware Installation Instructions BALDUR and ODEN Installation Instructions Structural Information For standard systems and most custom single door opening systems. General Overview

More information

Greenhouse Assembly Instructions

Greenhouse Assembly Instructions Greenhouse Assembly Instructions 6 x 1.93m) 6 x 8 GREENHOUSE 01 ASSEMBLY INSTRUCTIONS 6 x 6 GREENHOUSE 02 ASSEMBLY INSTRUCTIONS 6 x 4 GREENHOUSE 03 ASSEMBLY INSTRUCTIONS 6ft (1.93m x 1.9 Introduction Safety

More information

INSTALLATION MANUAL. Contents JAPANESE ENGLISH GERMAN FRENCH ITALIAN SPANISH. To the installing technician: CEILING BRACKET

INSTALLATION MANUAL. Contents JAPANESE ENGLISH GERMAN FRENCH ITALIAN SPANISH. To the installing technician: CEILING BRACKET Be sure to read this installation manual thoroughly prior to installation. If installation methods or non-standard parts not specified in this installation manual are used, accidents or injury may result.

More information

Clad Direct Glaze Window Installation Instructions

Clad Direct Glaze Window Installation Instructions Clad Direct Glaze Window Installation Instructions Sill flashing and sealing: 2. An overview of the proper flashing sequence is shown in figure 1. Please read entire installation instructions carefully

More information

Express5800/120Ed. Rack Mount Kit Installation Procedures PN: 455-01607-001

Express5800/120Ed. Rack Mount Kit Installation Procedures PN: 455-01607-001 Express5800/120Ed Rack Mount Kit Installation Procedures PN: 455-01607-001 Proprietary Notice and Liability Disclaimer The information disclosed in this document, including all designs and related materials,

More information

FL ADJUSTABLE RIDER BACKREST MOUNTING HARDWARE KIT

FL ADJUSTABLE RIDER BACKREST MOUNTING HARDWARE KIT -J070 REV. 0-0-0 FL ADJUSTABLE RIDER BACKREST MOUNTING HARDWARE KIT GENERAL Kit Number 9-09A Models For model fitment information, see the P&A Retail Catalog or the Parts and Accessories section of www.harley-davidson.com

More information

Variety of Control Options Control is possible via wall switches, remote control systems or integration into building management systems.

Variety of Control Options Control is possible via wall switches, remote control systems or integration into building management systems. Breezway Altair Powerlouvre Window 35 Breezway Altair Powerlouvre Window The Powerlourve Window motor is neatly concealed within the Easyscreen TM Frame or the Component Powerlouvre Head Section. Automated

More information

Solar Mounting System

Solar Mounting System Xiamen Antai New Energy Tech.Co., Ltd Installation Manual Antai Rail Solar Mounting System (Flat Roof Solution) Version 1.1 Office Add: 508#, North Tower, Guangxia Building Huli Torch Hi-tech Zone, Xiamen,

More information

Installation Instructions

Installation Instructions READ BEFORE INSTALLING UNIT For Slider Casement Air Conditioners To avoid risk of personal injury, property damage, or product damage due to the weight of this device and sharp edges that may be exposed:

More information

Beautifully Traditional

Beautifully Traditional Arcade 800mm Single Sliding Door Quadrant - nickel Arcade 900mm Single Sliding Door Quadrant - nickel ARC48 ARC49 INSTALLATION INSTRUCTIONS A www.arcadebathrooms.com IMPORTANT - Please read before installation

More information

Go-kart for little race-drivers

Go-kart for little race-drivers Go-kart for little race-drivers Drill and drive. Go-kart What it lacks in speed, it more than makes up for in fun: the go-kart will excite little race-drivers. 1 Introduction It s only a go-kart, but it

More information

How to Install UnderDeck The Original.

How to Install UnderDeck The Original. How to Install UnderDeck The Original. TOOLS: Chalk Line Caulk Gun Garden hose or water bucket Gloves Hammer or Screw Gun Power Mitre Saw with OSB Blade Pencil Pliers Safety Glasses Straight Edge / Carpenter

More information

QWALL 4 ACRYLIC SHOWER WALL INSTALLATION INSTRUCTIONS

QWALL 4 ACRYLIC SHOWER WALL INSTALLATION INSTRUCTIONS QWALL 4 ACRYLIC SHOWER WALL INSTALLATION INSTRUCTIONS IMPORTANT DreamLine TM reserves the right to alter, modify or redesign products at any time without prior notice. For the latest up-to-date technical

More information

Profiles in stock Standard catalogue. Discover the possibilities with aluminium profiles from Sapa

Profiles in stock Standard catalogue. Discover the possibilities with aluminium profiles from Sapa Profiles in stock Standard catalogue Discover the possibilities with aluminium from Sapa You can create your own profile or you can choose from a wide selection of standard. Delivery: 1 2 weeks for standard

More information

IMPORTANT INSTALLATION GUIDE VALENCIA SQUARE CORNER SHOWER READ ALL INSTRUCTIONS CAREFULLY BEFORE STARTING THE INSTALLATION

IMPORTANT INSTALLATION GUIDE VALENCIA SQUARE CORNER SHOWER READ ALL INSTRUCTIONS CAREFULLY BEFORE STARTING THE INSTALLATION INSTALLATION GUIDE VALENCIA SQUARE CORNER SHOWER SEALANT REQUIRED TO COMPLETE THIS INSTALLATION: (Not supplied) Sika Sikasil NG (Arctic White) To seal the WHITE shower door and returns to the shower tray.

More information

PUMP JACK SYSTEM AND ACCESSORIES

PUMP JACK SYSTEM AND ACCESSORIES Pump Jack Model # 2200 A low cost, easy to operate, safe, portable scaffolding built of rugged steel. It's perfect for shingling, siding, sheathing, insulating, painting, building, roofing, home repair

More information

Sliding Door Hardware Installation Instructions

Sliding Door Hardware Installation Instructions Sliding Door Hardware Installation Instructions Installation Instructions Structural Information For standard systems and most custom single door opening systems. General Overview ff All Krown Lab sliding

More information

HALE PET DOOR INSTALLATION INSTRUCTIONS HALE STANDARD PANEL MODEL

HALE PET DOOR INSTALLATION INSTRUCTIONS HALE STANDARD PANEL MODEL HALE PET DOOR INSTALLATION INSTRUCTIONS HALE STANDARD PANEL MODEL Please read these instructions carefully and completely before attempting to install Hale Pet Doors; they will guide you through the steps

More information

Owner s Manual Read and keep this manual. Patents World Wide

Owner s Manual Read and keep this manual. Patents World Wide Owner s Manual Read and keep this manual. Patents World Wide S & S Industries, Inc., Sarasota, FL, USA www.trail-gator.com Copyright 2008 All Rights Reserved The following manual is provided to assist

More information

SEQUEL ASSEMBLY INSTRUCTIONS. 6003 Compact Desk CUSTOMERSERVICE@BDIUSA.COM

SEQUEL ASSEMBLY INSTRUCTIONS. 6003 Compact Desk CUSTOMERSERVICE@BDIUSA.COM BIUSA.COM CUSTOMERSERVICE@BIUSA.COM Component List Sequel is engineered for easy assembly. Carefully follow this procedure to prevent any damage. A - 4mm Hex Wrench B - 1/4-20 x 12 mm Flat Head Machine

More information